This company is the largest manufacturer of thick steel oil, gas, petrochemical and water pipes in the Middle East. Meeting the satisfaction of clients by improving the quality of products, utilizing advanced technologies, enjoying expert manpower in all organizational levels at the subsidiary companies.
Long-term goals
Increasing the variety of steel products, entering the local and international markets, increasing the market share by creating new capabilities and development of current capabilities and capacities through technical and specialized survey of market demand
Development plan of Safa Rolling & Pipe Mills Complex
Casting and steel products manufacturing factories
1- Continuous melting and casting factory
Enjoying an annual capacity of 2,000,000 tons of steel billets and blooms, this factory meets the demands of other factories of this steel complex in raw materials.
2- Rail and heavy steel sections rolling factory
Annual capacity of this factory is 500,000 tons including types of railway, metro lines and types of heavy steel sections with the following specifications:
Types of rails with standards S49, S54, BV50, UIC60, and BS113A, 12-60 m long.
Types of H, IPE and INP girders 120-400 mm in dimensions, with standard DIN 1025, 6-12 m long.
Types of angle, channel beam, belt, rebar and different steel sections with DIN standard, 6-12 m long, for building and industrial purposes.
3- Light steel sections factory
Annual capacity of 750,000 tons, types of steel products such as girder and channel beam, 120-200 mm in dimensions, types of angle of 40*40*4 to 150*150*15 mm in dimensions for building and industrial purposes.
4- Steel rebar rolling mill
Annual capacity of 500,000 tons with types of simple and ribbed steel rebar 10-40 mm thick.
5- Steel wire rolling mill
Annual capacity of 250,000 tons of types of steel coils 5-10 mm in diameter.
Safa Complex development plan is under construction in a piece of land measuring 250 Ha with an approximate superstructure of 250,000 m² including working halls and spaces at the southside of Safa Rolling & Pipe Mills factories. At the present time, over 100,000 m² of the project has been completed with an approximate progress of 80%.
Infrastructural facilities of the second phase of Safa Rolling & Pipe Mills Company
1- Electricity: Facilities of the second high-voltage substation with a power of 63.20 kV and a consuming power of 60 MW.
2- Water: Water treatment factory with a capacity of 72 m3/h including types of water required for the factories
3- Natural gas: Pressure reduction station, 20,000 m3/h, more than 600 m pipeline for consumption of factories
4- Railway: In a station measuring 95 Ha beside the nationwide railways and design of local network lines for transfer of raw materials and produced products
5- Roads: Connection of transportation lines of factories to Tehran-Saveh Highway network, establishment of a transportation terminal for products and materials
6- Communications and information: Establishment of telephone lines including 100 international lines with 4,000 local sublines in the form of optical fiber, establishment of LAN and WAN network throughout all factories measuring 500 Ha.
All infrastructural facilities have been completed. Facilities for collection of industrial sewage are included based on the highest criteria of international standard.
With an approximate progress of 60%, Rail Rolling and Heavy Sections Factory will be soon put into operation. It is anticipated that other factories will be completed and put into operation until early 2013.